Dear Shushrut,
Thanks for reply.
I am not getting how to change the status with CNMASS. if possible pls inform the steps.
also from cj20n or cj02 we can change the status of WBS of 1 project at a time.
I have more than 200 WBS of more than 25 different projects, so is there any way that i can change the status?
Pls advise.