Dear All,
I have a situation where the production variance being calculated at the time of order settlement of a finished good material is not flowing to the profitability Report at one location however, when the same is being calculated at another location the same is correctly flowing.
Kindly guide me with the probable reasons for the same and the manner in which the same can be resloved.
Regards
Manish