The landed cost I am trying to modify possess multiple vendors.
I went onto a backup to test some ideas, i created separate landed costs documents for each of the vendors I'm using and tested again. The "Copy from" lists landed costs from the current selected vendor on the "Vendors" tab (the last vendor chosen being the selected by default). Meaning I can see and select the landed costs created for each vendor separately, but no the landed cost the contains both.