Hello,
I am wondering if the following scenario is possible via configuration..
I would like system to reject a batch for product having 1 year, 2 year, and 3 years expiry time frame.
Aside from activating my plant with SLED check in spro, and maintain the shelf-life related data in the material master, I am wondering is there any configuration still require to meet those requirement.
Regards,
Tuff