Product Costing SAP ECC 6.0 Ver

$
0
0

Hi Friends,

 

I have configured with all required things to calculate and get the following output

 

Raw material 1                  1Kg X 75/-          =  75-00

Raw material 2                  1Kg X 100/-        = 100-00

                                                                 -------------          175-00

RM Overhead Rate standard rate – 5%                                   8-75

                                                                                                               

Dept G  5Hrs  x Machine Hr Rate Rs.10/-                              50-00

                                                                                         -----------

                                                                                          233-75

                                                                                         -----------

 

When I run Transaction code CK11N system is giving the result total Rs.183.75 but not adding machine hr rate Rs.50/-.

 

I did the following configuration successfully

 

1) Creation of activity type –Machine hour:

Transaction code KL01

 

2) Creation of cost centers: (Tr.code is KS01)

 

3) Planning for machine hours

KP26)

 

4) calculation of Machine hour rate

(KSPI)

 

 

Pls help

 

Thanks & Regards