Dear experts,
I've the below scenario:
PIR : 1,000 created for 01.2016 in advance.
Strategy: 11 (Gross requirement planning), Req Type: BSF
Consumption mode 4 (Forward / backward 30 days), Mixed MRP: 2
On 1st of Jan morning, the production of 31st Dec'15 is posted. Say 5 qty.
Now, the requirement is showing 995 qty only for Jan, as it shows 5 qty as withdrawal qty. How to rectify this?
The posting date for 5 qty is in Dec'15 and business requires to show the PIR as 1,000 itself for Jan'16.
In short my issue is: PIR consumption takes place based on system data, instead of posting date.
Thanks
Prem