I have a scenario where there is a multi-level BOM out of which top 3 materials are Planned materials say A, B and C.
A is at the highest level of BOM, B is the next level and C is the 3rd level in the BOM followed by other SFGs and Raw materials.
Where A is planned as MTO, B is planned as MTS with stock consideration and C is planned as MTS without considering stock. The requirement is we want to do Simulative Planning for 1 year and Operative Planning for 3 months bucket. At the same time we have capacity constraints for A and B production work centers but for C we want to run production work center to its maximum capacity.
We have monthly process orders for B and C.
What Strategy group or group mix would you suggest for such scenarios?
Regards,
Shoyeb